Project objectives:
The project resulted in the construction of the PFTE for three different penetration axes in the city of Ravenna, covering a total length of approximately 2.8 km. In the initial phase, necessary surveys and inspections were conducted to assess the current state of infrastructure and mobility services along all axes. This included the creation of detailed maps and the estimation of vehicular, demand, public transport demand, and bicycle and pedestrian demand. Following a participatory process involving discussions with the administration and various citizen and stakeholder associations, the PFTE for the three penetration axes was drafted, meeting the design standards required by the norm of reference.
Output:
- Construction of the cognitive framework and technical and cartographic elaborations related to the current transport infrastructure.
- Analysis of current mobility demand aimed at supporting the design of interventions.
- Critical analysis of the results from the participatory process.
- Technical report related to the design proposals.
- Preparation of the detailed technical documents required by the Regulations.