Language

CONCEPT MASTER PLAN SPORT CENTRE IN SHANGAI

Client

DMAA

Year

2023

Project objectives:

The project involves constructing a stadium in Shanghai with a capacity of 16,000 spectators. The challenge is to design entry and exit procedures for the public, players, and services, as well as to develop evacuation plans and strategies using simulations. The proposal will include detailed mobility demand estimates, emphasizing efficiency, safety, and flexibility.

Output:

  • Defining the strategy for entry and exit of the public, players, and services.
  • Estimation of travel during different time periods and related mobility demands.
  • Detailed definition of proposed infrastructure and services.
  • Creation of evacuation plans, Performance analysis and sensitivity checks.

Gallery

Related projects

CONCEPT MASTER PLAN OF THE UPPER VALLEY IN THE LINE – SAUDI ARABIA

KSFD CONCEPT MASTER PLAN – RIYADH

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.